Caltrans SR89 update

Marc MERLIN merlin at merlins.org
Fri Nov 30 01:53:01 PST 2012


Update in http://marc.merlins.org/snow/roadinfo/sr89/ : 2012:11:30 01:53

Change since last update http://marc.merlins.org/snow/roadinfo/sr89/sr89.2012:11:30-01:53.diff :
-CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW  TIRES ON ALL 4 WHEELS FROM PICKETTS JCT (ALPINE CO) TO 2.7 MI SOUTH OF THE   JCT OF US 50 (EL DORADO CO) /LUTHER PASS/ 
+CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW  TIRES ON ALL 4 WHEELS FROM THE ALPINE/ELDORADO CO LINE TO 2.7 MI SOUTH OF THE   JCT OF US 50 (EL DORADO CO) /LUTHER PASS/ 

New state from http://www.dot.ca.gov/hq/roadinfo/sr89 saved at http://marc.merlins.org/snow/roadinfo/sr89/sr89.2012:11:30-01:53
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]      IS CLOSED FROM THE JCT OF US 395 (MONO CO) TO THE JCT OF SR 4   /MONITOR PASS/ (ALPINE CO) - DUE TO SNOW - MOTORISTS ARE ADVISED TO   USE AN ALTERNATE ROUTE  
[IN THE NORTHERN CALIFORNIA AREA & SIERRA NEVADA]      IS CLOSED FROM THE LASSEN VOLCANIC NAT'L PARK SOUTH BDRY TO THE   JCT OF SR 44 /LASSEN LOOP/ (TEHAMA, SHASTA CO) - FOR THE WINTER - MOTORISTS   ARE ADVISED TO USE AN ALTERNATE ROUTE  
CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW  TIRES ON ALL 4 WHEELS FROM THE ALPINE/ELDORADO CO LINE TO 2.7 MI SOUTH OF THE   JCT OF US 50 (EL DORADO CO) /LUTHER PASS/ 
1-WAY CONTROLLED TRAFFIC FROM 1.7 MI NORTH TO 2 MI NORTH OF THE   EL DORADO/PLACER CO LINE 24 HRS A DAY FROM 0600 HRS MONDAY THRU 1200 HRS FRIDAY  THRU 1/1/16 - DUE TO PERMIT WORK - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO   20 MINUTES 
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.4 MI NORTH TO 3.3 MI  NORTH OF THE EL DORADO/PLACER CO LINE 24 HRS A DAY FROM 0600 HRS MONDAY THRU  1200 HRS FRIDAY THRU 1/1/16 - DUE TO PERMIT WORK - MOTORISTS ARE SUBJECT TO   DELAYS OF UP TO 20 MINUTES 
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 3.8 MI NORTH OF  TAHOE CITY (PLACER CO) TO THE PLACER/NEVADA CO LINE FROM 1800 HRS EACH NIGHT TO  1000 HRS EACH MORNING MONDAY THRU SATURDAY THRU 12/4/12 - DUE TO MAINTENANCE 

Main page with google maps of Caltrans reporting points:
http://marc.merlins.org/snow/tahoe_caltrans.shtml



More information about the Sr89 mailing list