Caltrans SR89 update: REOPENED after 2500mn

Marc MERLIN merlin at merlins.org
Wed Apr 17 13:19:02 PDT 2013


Update in http://marc.merlins.org/snow/roadinfo/sr89/ : 2013:04:17 13:19

Change since last update http://marc.merlins.org/snow/roadinfo/sr89/sr89.2013:04:17-13:19.diff :
+[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]      IS REOPENED FROM THE JCT OF US 395 (MONO CO) TO THE JCT OF SR 4   /MONITOR PASS/ (ALPINE CO) AT 1303 HRS ON 4/17/13 

New state from http://www.dot.ca.gov/hq/roadinfo/sr89 saved at http://marc.merlins.org/snow/roadinfo/sr89/sr89.2013:04:17-13:19
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]      IS REOPENED FROM THE JCT OF US 395 (MONO CO) TO THE JCT OF SR 4   /MONITOR PASS/ (ALPINE CO) AT 1303 HRS ON 4/17/13 
[IN THE NORTHERN CALIFORNIA AREA & SIERRA NEVADA]      IS CLOSED FROM THE LASSEN VOLCANIC NAT'L PARK SOUTH BDRY TO THE   JCT OF SR 44 /LASSEN LOOP/ (TEHAMA, SHASTA CO) - FOR THE WINTER - MOTORISTS   ARE ADVISED TO USE AN ALTERNATE ROUTE  
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE   EL DORADO/PLACER CO LINE TO 0.6 MI NORTH OF THE EL DORADO/PLACER CO LINE   24 HRS A DAY FROM 0600 HRS MONDAY THRU 1200 HRS FRIDAY THRU 4/19/13   - DUE TO PERMIT WORK  
1-WAY CONTROLLED TRAFFIC FROM 1.7 MI NORTH TO 2 MI NORTH OF THE   EL DORADO/PLACER CO LINE 24 HRS A DAY FROM 0600 HRS MONDAY THRU 1200 HRS FRIDAY  THRU 1/1/16 - DUE TO PERMIT WORK - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO   20 MINUTES 
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.2 MI NORTH TO 2.9 MI   NORTH OF THE EL DORADO/PLACER CO LINE 24 HRS A DAY FROM 0600 HRS MONDAY THRU   1200 HRS FRIDAY THRU 4/19/13 - DUE TO PERMIT WORK 

Main page with google maps of Caltrans reporting points:
http://marc.merlins.org/snow/tahoe_caltrans.shtml



More information about the Sr89 mailing list