Caltrans SR89 update: REOPENED after 8h43mn

Marc MERLIN marc at merlins.org
Mon Oct 29 23:03:02 PDT 2018


Update in http://marc.merlins.org/snow/roadinfo/sr89/ : 2018:10:29 23:03

Change since last update http://marc.merlins.org/snow/roadinfo/sr89/sr89.2018:10:29-23:03.diff :
+IS REOPENED FROM THE JCT OF SR 88 /PICKETTS JCT/ (ALPINE CO) TO 2.5 MI   SOUTH OF THE JCT OF US 50 /AT PORTAL DR/ (EL DORADO CO) AT 2255 HRS ON 10/29/18 
+IS REOPENED FROM THE JCT OF SR 88 /PICKETTS JCT/ (ALPINE CO) TO 2.5 MI   SOUTH OF THE JCT OF US 50 /AT PORTAL DR/ (EL DORADO CO) AT 2255 HRS ON 10/29/18 

New state from http://www.dot.ca.gov/hq/roadinfo/sr89 saved at http://marc.merlins.org/snow/roadinfo/sr89/sr89.2018:10:29-23:03
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]      1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF US 395   (MONO CO) TO THE MONO/ALPINE CO LINE FROM 0700 HRS TO 1700 HRS MONDAY THRU   FRIDAY THRU 11/2/18 - DUE TO CONSTRUCTION 
IS REOPENED FROM THE JCT OF SR 88 /PICKETTS JCT/ (ALPINE CO) TO 2.5 MI   SOUTH OF THE JCT OF US 50 /AT PORTAL DR/ (EL DORADO CO) AT 2255 HRS ON 10/29/18 
[IN THE NORTHERN CALIFORNIA AREA & SIERRA NEVADA]      1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 5.7 MI NORTH OF THE   JCT OF SR 28 /AT SQUAW CREEK/ TO 4.2 MI SOUTH OF TRUCKEE   /AT GOOSE MEADOWS CAMPGROUND/ (PLACER CO) FROM 0700 HRS TO 1800 HRS MONDAY THRU  FRIDAY THRU 11/2/18 - DUE TO CONSTRUCTION 
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.8 MI NORTH TO  1.3 MI NORTH OF THE JCT OF SR 70 (PLUMAS CO) FROM 0700 HRS TO 1700 HRS MONDAY   THRU WEDNESDAY THRU 10/31/18 - DUE TO PERMIT WORK 
IS REOPENED FROM THE JCT OF SR 88 /PICKETTS JCT/ (ALPINE CO) TO 2.5 MI   SOUTH OF THE JCT OF US 50 /AT PORTAL DR/ (EL DORADO CO) AT 2255 HRS ON 10/29/18 

Main page with google maps of Caltrans reporting points:
http://marc.merlins.org/snow/tahoe_caltrans.shtml



More information about the Sr89 mailing list