Caltrans SR89 update: CLOSURE

Marc MERLIN marc at merlins.org
Sun May 8 23:15:15 PDT 2022


Update in from https://roads.dot.ca.gov/ : 2022:05:08 23:15

Change since last update http://marc.merlins.org/snow/roadinfo/sr89/sr89.2022:05:08-23:15.diff :
-[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA] IS CLOSED FROM THE JCT OF US 395 (MONO CO) TO THE JCT OF SR 4 /MONITOR PASS/ (ALPINE CO) AT 1159 HRS ON 5/8/22 - DUE TO ADVERSE WEATHER - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE
+[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA] IS CLOSED FROM THE JCT OF US 395 (MONO CO) TO THE JCT OF SR 4 /MONITOR PASS/ (ALPINE CO) - DUE TO ADVERSE WEATHER - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE

New state from https://roads.dot.ca.gov/ saved at http://marc.merlins.org/snow/roadinfo/sr89/sr89.2022:05:08-23:15
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA] IS CLOSED FROM THE JCT OF US 395 (MONO CO) TO THE JCT OF SR 4 /MONITOR PASS/ (ALPINE CO) - DUE TO ADVERSE WEATHER - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE
CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW TIRES ON ALL 4 WHEELS FROM PICKETTS JCT (ALPINE CO) TO 2.7 MI SOUTH OF THE JCT OF US 50 (EL DORADO CO) /LUTHER PASS/
[IN THE NORTHERN CALIFORNIA AREA] IS CLOSED FROM THE LASSEN VOLCANIC NAT'L PARK SOUTH BDRY TO THE JCT OF SR 44 /LASSEN LOOP/ (TEHAMA, SHASTA CO) - FOR THE WINTER - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE
CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW TIRES ON ALL 4 WHEELS FROM PICKETTS JCT (ALPINE CO) TO 2.7 MI SOUTH OF THE JCT OF US 50 (EL DORADO CO) /LUTHER PASS/
CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW TIRES ON ALL 4 WHEELS FROM 5 MI NORTH OF THE JCT OF US 50 TO BLISS STATE PARK (EL DORADO CO)
CHAINS ARE REQUIRED ON ALL VEHICLES EXCEPT 4-WHEEL-DRIVE VEHICLES WITH SNOW TIRES ON ALL 4 WHEELS FROM TRUCKEE (NEVADA CO) TO 11 MI NORTH OF TRUCKEE (SIERRA CO)
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 70 TO 1.5 MI NORTH OF THE JCT OF SR 147 (PLUMAS CO) FROM 0700 HRS TO 1530 HRS 7 DAYS A WEEK THRU 6/24/22 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE NORTH JCT OF SR 70 TO 1.5 MI NORTH OF THE JCT OF SR 147 (PLUMAS CO) 24 HRS A DAY THRU 1530 HRS ON 6/24/22 - DUE TO FIRE REHABILITATION - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 1 HOUR 

Main page with google maps of Caltrans reporting points:
http://marc.merlins.org/snow/tahoe_caltrans.shtml



More information about the Sr89 mailing list