Caltrans US50 update: REOPENED
Marc MERLIN
marc at merlins.org
Fri Apr 9 14:15:25 PDT 2021
Update in from https://roads.dot.ca.gov/ : 2021:04:09 14:15
Change since last update http://marc.merlins.org/snow/roadinfo/us50/us50.2021:04:09-14:15.diff :
-[IN THE SACRAMENTO VALLEY & THE LAKE TAHOE BASIN] IS REOPENED TO 1-WAY CONTROLLED TRAFFIC FROM SLY PARK RD /IN POLLOCK PINES/ TO ECHO SUMMIT (EL DORADO CO) AR 1409 HRS ON 4/9/21 - DUE TO A ROCKSLIDE
New state from https://roads.dot.ca.gov/ saved at http://marc.merlins.org/snow/roadinfo/us50/us50.2021:04:09-14:15
[IN THE SACRAMENTO VALLEY & THE LAKE TAHOE BASIN] 1-WAY CONTROLLED TRAFFIC FROM SLY PARK RD /IN POLLOCK PINES/ TO ECHO SUMMIT (EL DORADO CO) AR 1409 HRS ON 4/9/21 - DUE TO A ROCKSLIDE
Main page with google maps of Caltrans reporting points:
http://marc.merlins.org/snow/tahoe_caltrans.shtml
_______________________________________________
Us50 mailing list
Us50 at lists.merlins.org
http://lists.merlins.org/lists/listinfo/us50
More information about the Tahoeroads
mailing list